Case brief: Precision sub-contract engineering: increasing manufacturing efficiency through in-process control (pdf)

  • Download file
  • File size: 1.49 MB
  • Language: English

This type of file requires a viewer, freely available from Adobe

Case brief: Precision sub-contract engineering: increasing manufacturing efficiency through in-process control

Case brief highlighting the challenges faced by a British sub-contractor (QEP) when producing a wide variety of products and how Renishaw systems helped overcome them.

Part number: H-2000-3862